Each location has a building scheduler as designated in the online calendar system. It's under Manage Locations and Resources. You select the location, then click Edit, then there is a box containing all the building schedulers, and an Add Building Scheduler button to add additional schedulers.macsense wrote:Yes, those are the instructions to which I'm referring. Where would he be designated as a stake building scheduler? In the Stake MLS or online somewhere in the calendar system?
But note that for me at least, adding a scheduler and clicking Save Changes results in an eternal spinner. The changes are never saved. This worked last week, but not now.
Another ambiguity I see in that passage I quoted is that it says "... before the stake building scheduler can manage locations and resources." Does that mean that he would have access to the "Manage Locations and Resources" page, where he could then manage all locations and resources, just like any administrator? Or is it speaking more generically, and it simply means that he can manage those locations and resources for which he has been designated as Building Scheduler? I could read it either way. If it's the former, then it shouldn't matter if they have been designated as a building scheduler; if it's the latter, then it would make perfect sense for them to be required to be a Building Scheduler.