Calling and Recording a Building Scheduler
Posted: Sat Nov 19, 2011 9:56 pm
As we try to get building schedulers called for 2012 to fully utilize the scheduling/resource capabilities of the calendar, I was a little confused by MLS.
At the ward level (I haven't checked the stake MLS yet) I see 15 different standard calling "scheduler" positions: "District Scheduler - Building X", "Scheduler - Building X", or "Stake Scheduler - Building X". (For each X, I get a number 1-5, which I assume is because have 5 buildings in our stake).
I'll probably record our building schedulers under "Scheduler" since these aren't really 'stake' or 'district' callings (they aren't extended by the Stake Presidency or high council).
I found it odd to have 'building 1', 'building 2', etc next to each standard calling. Our buildings aren't numbered like that anywhere else... so these numbers are rather arbitrary. They aren't used for "Building Representatives"/PFRs.
At the ward level (I haven't checked the stake MLS yet) I see 15 different standard calling "scheduler" positions: "District Scheduler - Building X", "Scheduler - Building X", or "Stake Scheduler - Building X". (For each X, I get a number 1-5, which I assume is because have 5 buildings in our stake).
I'll probably record our building schedulers under "Scheduler" since these aren't really 'stake' or 'district' callings (they aren't extended by the Stake Presidency or high council).
I found it odd to have 'building 1', 'building 2', etc next to each standard calling. Our buildings aren't numbered like that anywhere else... so these numbers are rather arbitrary. They aren't used for "Building Representatives"/PFRs.